🇺🇸 CDL education for America’s Uzbek communityUZ · EN
Home / News / Truck Parking & Safety
Truck Parking & Safety

$200 million truck-parking expansion: 14 projects across 12 states

USDOT announced $200 million for 14 truck-parking projects across 12 states. The awards target critical freight corridors, but drivers should remember that funded spaces still require construction and are not automatically available today.

UZUzbekCDL Editorial DeskOctober 15, 2026 · 4 minute read
Truck Parking & SafetyUZBEKCDLDAILY DRIVER BRIEF
01

What happened

The U.S. Department of Transportation announced on Oct. 14 that $200 million in FY 2026 INFRA funding will support 14 truck-parking expansion projects across 12 states. FMCSA says the investment is intended to add public commercial-vehicle parking on major freight corridors, reduce unsafe roadside parking and help drivers find legal rest locations. The agency also says USDOT has invested more than $300 million in truck-parking grants since April 2025. These are project awards: design, permitting and construction still have to occur, so the announcement does not mean every space is open now.

02

What drivers should do

Named projects include approximately 275 commercial-vehicle spaces near the Port of Savannah in Georgia; modernization and expansion at six public rest areas along I-80 in Iowa; about 140 truck spaces and 50 container-staging positions at the Port of Wilmington in North Carolina; approximately 100 spaces at a Pilot Travel Center along I-35 in Fort Worth, Texas; about 305 spaces near the Los Indios Port of Entry in Cameron County, Texas; and approximately 106 spaces at two I-41 safety rest areas in Wisconsin. Drivers should watch the responsible state or port agency for construction schedules and opening dates.

03

Why this matters to our community

Plan parking with today's confirmed capacity, not a future grant announcement. Before departure, identify a primary legal stop and at least one backup, check current state-DOT or 511 information, and verify whether a private location accepts reservations. Recheck the plan before the HOS clock becomes tight; a full lot does not authorize unsafe roadside parking or driving while fatigued. Small carriers should include parking availability in route, appointment, fuel and detention planning and avoid dispatch schedules that leave no safe margin. Useful English terms include truck-parking expansion, public rest area, dedicated space, freight corridor, INFRA grant, construction schedule, legal parking, backup location and hours-of-service clock.